|
3790 Department of Parks, Recreation
Infrastructure Overview
The system consists of 280 parks, beaches, trails, wildlife areas, open spaces, off-highway vehicle areas, and historic sites. Parks is responsible for approximately 1.6 million acres of land, including over 343 miles of coastline, 984 miles of lake, reservoir and river frontage, approximately 14,500 campsites and group campsites, and 4,754 miles of non-motorized trails.
Over the past five years Parks has expended approximately $157 million to develop and expand the state park system. Parks has accepted gifts and other donations of property and historic structures at no cost to the state when those donations make programmatic sense.
SUMMARY OF PROJECTS Back to
Top Provides
expenditures for each major and minor capital project funded
in this state agency's budget for the past, current, and
budget years.
2860 |
CAPITAL OUTLAY |
|
|
|
|
Projects |
|
|
|
0000208 |
Angel Island SP: East Garrison Mooring Field |
7 |
24 |
620 |
|
Preliminary Plans |
7 |
24 |
- |
|
Working Drawings |
- |
- |
38 |
|
Construction |
- |
- |
582 |
0000209 |
Angel Island SP: Immigration Station Hospital Rehabilitation |
- |
2,952 |
2,952 |
|
Construction |
- |
2,952 |
2,952 |
0000210 |
Bidwell-Sacramento River SP: Irvine Finch Ramp Repair and Extension |
21 |
- |
- |
|
Preliminary Plans |
21 |
- |
- |
0000211 |
California Indian Museum |
41 |
1,134 |
- |
|
Preliminary Plans |
41 |
1,134 |
- |
0000213 |
Carnegie SVRA: Road Reconstruction |
- |
- |
7,813 |
|
Construction |
- |
- |
7,813 |
0000214 |
Carnegie SVRA: Vehicle Wash Station |
5 |
23 |
1,338 |
|
Working Drawings |
5 |
23 |
- |
|
Construction |
- |
- |
1,338 |
0000215 |
Chino Hills SP: Entrance Road |
1,092 |
335 |
- |
|
Construction |
1,092 |
335 |
- |
0000217 |
Donner Memorial SP: Enhance Museum |
131 |
74 |
- |
|
Construction |
131 |
74 |
- |
0000218 |
Donner Memorial SP: New Visitor Center |
220 |
64 |
- |
|
Construction |
220 |
64 |
- |
0000219 |
El Capitan SB: Construct New Lifeguard Operations Facility |
116 |
607 |
8,964 |
|
Preliminary Plans |
116 |
607 |
- |
|
Working Drawings |
- |
- |
619 |
|
Construction |
- |
- |
8,247 |
|
Equipment |
- |
- |
98 |
0000220 |
Fort Ord Dunes SP: New Campground |
631 |
31 |
19,176 |
|
Working Drawings |
631 |
31 |
- |
|
Construction |
- |
- |
19,176 |
0000223 |
Hollister Hills SVRA: Infrastructure |
933 |
- |
- |
|
Construction |
933 |
- |
- |
0000224 |
Hungry Valley SVRA: Vehicle Wash Station |
20 |
8 |
1,034 |
|
Working Drawings |
20 |
8 |
- |
|
Construction |
- |
- |
1,034 |
0000225 |
Leo Carrillo SP: Steelhead Trout Barrier Removal |
18 |
2,563 |
286 |
|
Construction |
18 |
2,563 |
286 |
0000226 |
Los Angeles SHP: Site Development |
3,543 |
119 |
- |
|
Construction |
3,543 |
119 |
- |
0000227 |
MacKerricher SP: Replace Water Treatment System |
136 |
445 |
2,474 |
|
Preliminary Plans |
136 |
445 |
- |
|
Working Drawings |
- |
- |
251 |
|
Construction |
- |
- |
2,223 |
0000228 |
Malibu Creek SP: Restore Sepulveda |
699 |
- |
- |
|
Construction |
699 |
- |
- |
0000229 |
Marshall Gold Discovery SHP: Park Improvements |
1,347 |
- |
- |
|
Construction |
1,347 |
- |
- |
0000230 |
McArthur-Burney Falls Memorial SP: Ramp and Boarding Float Replacement |
23 |
22 |
671 |
|
Preliminary Plans |
23 |
22 |
- |
|
Working Drawings |
- |
- |
53 |
|
Construction |
- |
- |
618 |
0000232 |
Oceano Dunes SVRA: Pismo SB Visitor Center |
4,549 |
705 |
- |
|
Working Drawings |
63 |
- |
- |
|
Construction |
4,486 |
705 |
- |
0000234 |
Oceano Dunes SVRA: Pismo SB Sediment Track-out Prevention |
13 |
67 |
95 |
|
Preliminary Plans |
13 |
67 |
- |
|
Working Drawings |
- |
- |
95 |
0000235 |
Old Town San Diego SHP: Building Demolition |
559 |
- |
7,344 |
|
Preliminary Plans |
260 |
- |
- |
|
Working Drawings |
299 |
- |
- |
|
Construction |
- |
- |
7,344 |
0000237 |
San Elijo SB: Replace Main Lifeguard Tower |
139 |
321 |
5,014 |
|
Working Drawings |
139 |
321 |
- |
|
Construction |
- |
- |
5,011 |
|
Equipment |
- |
- |
3 |
0000238 |
Silverwood Lake SRA: Nature Center |
591 |
236 |
- |
|
Construction |
591 |
194 |
- |
|
Equipment |
- |
42 |
- |
0000239 |
South Yuba River SP: Historic Covered Bridge |
- |
193 |
1,125 |
|
Preliminary Plans |
- |
193 |
- |
|
Working Drawings |
- |
- |
163 |
|
Construction |
- |
- |
962 |
0000241 |
Southern California Opportunity Purchase |
24,716 |
2,476 |
2,460 |
|
Acquisition |
24,716 |
2,476 |
2,460 |
0000243 |
Statewide: OHV Opportunity Purchase |
3,285 |
- |
- |
|
Acquisition |
3,285 |
- |
- |
0000244 |
Statewide: OHV Minor Capital Outlay Program |
74 |
- |
1,716 |
|
Minor Projects |
74 |
- |
1,716 |
0000633 |
Statewide: SP System Acquisition Program |
87 |
700 |
- |
|
Acquisition |
87 |
700 |
- |
0000634 |
Statewide: DBW Minor Capital Outlay Program |
2,023 |
- |
- |
|
Minor Projects |
2,023 |
- |
- |
0000694 |
Gaviota SP: Main Water Supply Upgrades |
- |
215 |
142 |
|
Preliminary Plans |
- |
215 |
- |
|
Working Drawings |
- |
- |
142 |
0000695 |
Heber Dunes SVRA: Water System Upgrades |
- |
84 |
1,086 |
|
Preliminary Plans |
- |
84 |
- |
|
Working Drawings |
- |
- |
96 |
|
Construction |
- |
- |
990 |
0000696 |
Malibu Creek SP: New Stokes Creek Bridge |
- |
232 |
233 |
|
Preliminary Plans |
- |
232 |
- |
|
Working Drawings |
- |
- |
233 |
0000697 |
Torrey Pines SNR: Sewer and Utility Modernization |
- |
160 |
2,276 |
|
Preliminary Plans |
- |
160 |
- |
|
Working Drawings |
- |
- |
127 |
|
Construction |
- |
- |
2,149 |
0000698 |
Mendocino Headlands SP: Big River Watershed Restoration |
- |
96 |
1,645 |
|
Preliminary Plans |
- |
96 |
- |
|
Working Drawings |
- |
- |
199 |
|
Construction |
- |
- |
1,446 |
0000699 |
Old Sacramento SHP: Boiler Shop Renovation |
- |
- |
726 |
|
Preliminary Plans |
- |
- |
726 |
0000700 |
McArthur-Burney Falls SP: Group Camp Development |
- |
- |
62 |
|
Preliminary Plans |
- |
- |
39 |
|
Working Drawings |
- |
- |
23 |
0000728 |
Heber Dunes SVRA: Initial Development |
339 |
135 |
- |
|
Construction |
318 |
- |
- |
|
Equipment |
21 |
135 |
- |
0000754 |
Hollister Hills SVRA: Waterline Expansion |
- |
- |
1,367 |
|
Working Drawings |
- |
- |
62 |
|
Construction |
- |
- |
1,305 |
0000764 |
Border Field SP: Public Use Improvements |
- |
678 |
- |
|
Preliminary Plans |
- |
678 |
- |
0000765 |
McGrath SB: Campground Relocation and Wetlands Restoration |
- |
- |
1,029 |
|
Preliminary Plans |
- |
- |
1,029 |
0000896 |
Angel Island SP: Immigratn Statn Hosp Ph3 |
3,065 |
360 |
- |
|
Construction |
3,065 |
360 |
- |
0000912 |
El Capitan SB: Entrance Improvements |
- |
- |
358 |
|
Preliminary Plans |
- |
- |
358 |
0000913 |
Statewide: Rec Trails Minor Cap Outlay Program |
- |
- |
900 |
|
Minor Projects |
- |
- |
900 |
0000914 |
Prairie City SVRA: Initial Erosion Control |
- |
- |
275 |
|
Preliminary Plans |
- |
- |
275 |
0000915 |
Statewide: Minor Capital Outlay Program |
- |
- |
395 |
|
Minor Projects |
- |
- |
395 |
0000932 |
Topanga SP: Rehabilitate Trippet Ranch Parking Lot |
- |
- |
316 |
|
Preliminary Plans |
- |
- |
316 |
0001033 |
Malakoff Diggins SHP: Solar Panel Generator |
- |
- |
700 |
|
Preliminary Plans |
- |
- |
75 |
|
Working Drawings |
- |
- |
40 |
|
Construction |
- |
- |
585 |
Total Expenditures (All Projects) |
$48,423 |
$15,059 |
$74,592 |
FUNDING Back to Top
0001 |
General Fund |
$
- |
$
- |
$
3,652 |
0005 |
Safe Neighborhood Parks, Clean Water, Clean Air, and Coastal Protection Bond Fund |
838 |
321 |
5,014 |
0263 |
Off-Highway Vehicle Trust Fund |
33,934 |
3,498 |
17,184 |
0392 |
State Parks and Recreation Fund |
2 |
678 |
- |
0516 |
Harbors and Watercraft Revolving Fund |
2,074 |
46 |
1,291 |
0890 |
Federal Trust Fund |
- |
400 |
546 |
0995 |
Reimbursements |
16 |
5,211 |
1,993 |
6029 |
California Clean Water, Clean Air, Safe Neighborhood Parks, and Coastal Protection Fund |
1,440 |
2,233 |
1,029 |
6051 |
Safe Drinking Water, Water Quality and Supply, Flood Control, River and Coastal Protection Fund of 2006 |
10,119 |
2,672 |
43,883 |
Total
Expenditures (All Funds) |
$
48,423 |
$
15,059 |
$
74,592 |
Refer to the
Infrastructure Detail of Appropriations and Adjustments (pdf * - 7K)
document for additional
information.
|