3860 Department of Water Resources
Infrastructure Overview

The Department of Water Resources has two major infrastructure programs: the State Water Project and the flood control system in the Central Valley. The State Water Project is a water storage and delivery system that consists of 34 storage facilities, reservoirs, and lakes, 20 pumping plants, 4 pumping-generating plants, 5 hydroelectric power plants, and over 700 miles of canals and pipelines. The Project provides water to 25 million Californians and 750,000 acres of irrigated farmland. The Project also provides recreational opportunities to approximately 6 million visitors annually at 15 separate reservoir-based facilities as well as public fishing access to the entire Aqueduct. Existing flood control infrastructure in the Central Valley consists of 1,595 miles of levees, 348,000 acres of channels and floodways, over 800,000 linear feet of bank protection, over 60 mitigation and environmental restoration sites, and 55 various flood control structures including dams, weirs, pumping plants, diversion structures, gate structures, and drop structures. In general, these facilities provide more flood protection in urbanized areas and less in agricultural areas.


SUMMARY OF PROJECTS Back to Top
Provides expenditures for each major and minor capital project funded in this state agency's budget for the past, current, and budget years. The project phase and fund classification are also identified. The Standard Footnotes key can be accessed by clicking on any footnote link.


Code State Building Program Expenditures Actual
2011-12*
Estimated
2012-13*
Proposed
2013-14*
01 CAPITAL OUTLAY      
  Major Projects      
10.95 CONTINUING FORMULATION OF THE CALIFORNIA WATER PLAN $-   $30,450   $28,366  
10.95.180 Franks Tract Pilot Project -   30,450 AWCb -  
10.95.200 Salton Sea Species Conservation Habitat Project -   -   28,366 Cr
20.95 IMPLEMENTATION OF THE STATE WATER RESOURCES DEVELOPMENT SYSTEM 263,102   300,844   324,202  
30.95 PUBLIC SAFETY AND PREVENTION OF DAMAGE $138,684   $558,045   $138,234  
30.95.021 Feather River Early Implementation Project 9,237 Cb 58,896 Cb -  
30.95.022 Feather River Urban Risk Reduction Project -   -   76,720 Cb
30.95.026 Land Acquisition for Mitigation Bank(s) to Support Delta Levee Repairs -   1,094 AWPCb -  
30.95.105 Marysville/Yuba Levee Reconstruction 1 ACgr 396 ACgr -  
30.95.111 1997 Flood Damage Repair Projects -   922 ACgr -  
30.95.115 American River Flood Control Project Phase 1 - Common Elements 2,804 ACbr 9,678 ACbr -  
30.95.130 West Sacramento Project 132 CSbr 5,352 CSbr -  
30.95.135 West Sacramento Project (GRR) 1,913 Sbr 1,388 Sbr 1,227 Sbr
30.95.140 Delta Flood Emergency Preparedness, Response, and Recovery Project -   20,000 Cb -  
30.95.155 Mid-Valley Levee Reconstruction Project 285 ACbr 6,916 ACbr -  
30.95.160 West Sacramento Early Implementation Project 14,799 ACb 108,619 ACb -  
30.95.200 Magpie Creek Small Flood Control Project -   2,019 ACWbr -  
30.95.211 1997 Flood Damage Repair Projects - San Joaquin Valley -   346 ACg -  
30.95.250 Yuba River Basin Project 298 CSWbr 1,807 CSWbr 645 Sbr
30.95.251 Marysville Ring Levee Reconstruction Project 257 Cbr 1,775 Cbr 12,423 Cbr
30.95.260 South Sacramento County Streams 5,061 ACWbr 19,678 ACWbr -  
30.95.280 Terminus Dam, Lake Kaweah Project -   1,437 Cbr -  
30.95.302 Sutter Basin Feasibility Study 1,267 Sbr 627 Sbr 1,284 Sbr
30.95.305 Rock Creek-Keefer Slough Feasibility Study 43 Sb 1,047 Sbr -  
30.95.306 West Stanislaus Feasibility Study 78 Sb 557 Sbr 204 Sbr
30.95.310 Lower Cache Creek, Yolo County, Woodland Area Project 889 Sb 1,003 Sbr 477 Sbr
30.95.311 Folsom Dam Modifications Project 48,251 Cbr 70,513 ACbr 40,999 Cbr
30.95.314 Frazier Creek/Strathmore Creek Feasiblity Study 39 Sb 1,312 Sbr -  
30.95.315 White River/Deer Creek Feasiblity Study 39 Sb 1,330 Sbr -  
30.95.316 Merced County Streams Project Bear Creek Unit 35 Sbr 3,476 CSbr -  
30.95.320 Lower San Joaquin River Regional Project 2,262 Sbr 1,418 Sbr 572 Sbr
30.95.327 Sacramento River Flood Control System Evaluation -   390 Sb 333 Sb
30.95.328 American River Watershed, Folsom Dam Raise Project -10 ACb 221 ACb 3,350 Cbr
30.95.330 American River Watershed, Folsom Dam Raise Project, Bridge Element -   1,613 ACb -  
30.95.337 Butte Slough Outfall Gates Rehabilitation Project 499 CWb 14,596 CWb -  
30.95.340 Systemwide Levee Evaluations and Repairs 38,154 ACb 200,504 ACPSWb -  
30.95.341 State-Federal Flood Control Evaluations 5,066 Wb 6,793 Wb -  
30.95.342 Sutter Pumping Plants' Control System 1,999 ACb 1,635 ACb -  
30.95.343 Sutter Bypass East Water Control Structures 1,390 Cb 915 CWb -  
30.95.344 Knights Landing Outfall Gates Rehabilitation 2,949 ACb 6,154 ACb -  
30.95.345 Sacramento Yard-Soil and Groundwater Investigation and Remediation 947 CWb 3,618 CWb -  
  Totals, Major Projects $401,786   $889,339   $490,802  
Total Expenditures (All Projects) $401,786   $889,339   $490,802  

FUNDING Back to Top
Fund Code Fund Actual
2011-12*
Estimated
2012-13*
Proposed
2013-14*
0001 General Fund $1 $1,065 $-
0506 Central Valley Water Project Construction Fund 263,102 300,844 312,878
0995 Reimbursements 27,832 48,358 46,710
6008 State Capital Protection Subaccount - 1,490 -
6026 Bay-Delta Multipurpose Water Management Subaccount - 20,450 -
6031 Water Security, Clean Drinking Water, Coastal and Beach Protection Fund of 2002 - 10,000 -
6051 Safe Drinking Water, Water Quality and Supply, Flood Control, River and Coastal Protection Fund of 2006 106 1,234 11,528
6052 Disaster Preparedness and Flood Prevention Bond Fund of 2006 110,745 505,898 119,686
Total Expenditures (All Funds) $401,786 $889,339 $490,802

Refer to the
Infrastructure Detail of Appropriations and Adjustments (pdf * - 5K) document for additional information.