3860 Department of Water Resources
Infrastructure Overview

The Department of Water Resources has two major infrastructure programs: the State Water Project and the flood control system in the Central Valley. The State Water Project is a water storage and delivery system that consists of 30 dams, 20 reservoirs, 20 pumping plants, 3 pumping-generating plants, 5 hydroelectric power plants, and over 670 miles of canals and pipelines. The Project provides water to 25 million Californians and 750,000 acres of irrigated farmland. The Project also provides recreational opportunities to approximately 6 million visitors annually at 15 separate reservoir-based facilities as well as public fishing access to the entire Aqueduct. Existing flood control infrastructure in the Central Valley consists of 1,595 miles of levees, 348,000 acres of channels and floodways, over 800,000 linear feet of bank protection, over 60 mitigation and environmental restoration sites, and 55 various flood control structures including dams, weirs, pumping plants, diversion structures, gate structures, and drop structures. In general, these facilities provide more flood protection in urbanized areas and less in agricultural areas.


SUMMARY OF PROJECTS Back to Top
Provides expenditures for each major and minor capital project funded in this state agency's budget for the past, current, and budget years. The project phase and fund classification are also identified. The Standard Footnotes key can be accessed by clicking on any footnote link.


Code State Building Program Expenditures Actual
2010-11*
Estimated
2011-12*
Proposed
2012-13*
01 CAPITAL OUTLAY      
  Major Projects      
10.95 CONTINUING FORMULATION OF THE CALIFORNIA WATER PLAN $-   $30,450   $-  
10.95.180 Franks Tract Pilot Project -   30,450 AWCb -  
20.95 IMPLEMENTATION OF THE STATE WATER RESOURCES DEVELOPMENT SYSTEM -   289,120 Vn 232,234 Vn
30.95 PUBLIC SAFETY AND PREVENTION OF DAMAGE $149,921   $529,540   $-  
30.95.021 Feather River Early Implementation Project -   20,744 Cb -  
30.95.026 Land Acquisition for Mitigation Bank(s) to Support Delta Levee Repairs -   1,094 AWPCb -  
30.95.105 Marysville/Yuba Levee Reconstruction -   397 ACgr -  
30.95.111 1997 Flood Damage Repair Projects -   922 ACgr -  
30.95.115 American River Flood Control Project Phase 1 - Common Elements 12,022 ACbr 12,526 ACbr -  
30.95.130 West Sacramento Project 9,683 CSbr 5,484 CSbr -  
30.95.135 West Sacramento Project (GRR) -   1,995 Sbr -  
30.95.155 Mid-Valley Levee Reconstruction Project 2,068 ACbr 7,201 ACbr -  
30.95.160 West Sacramento Early Implementation Project 34,202 ACb 47,888 ACb -  
30.95.200 Magpie Creek Small Flood Control Project -   2,019 ACWbr -  
30.95.206 Natomas Levee Improvement Program Early Implementation Project 260 ACb -   -  
30.95.211 1997 Flood Damage Repair Projects - San Joaquin Valley -   346 ACg -  
30.95.245 American River Flood Control Project - Natomas Features -494 Og -   -  
30.95.250 Yuba River Basin Project 1,394 CWbr 2,250 CSWbr -  
30.95.251 Marysville Ring Levee Reconstruction Project 16,948 Cbr 2,032 Cbr -  
30.95.260 South Sacramento County Streams 4,006 ACWbr 24,739 ACWbr -  
30.95.280 Terminus Dam, Lake Kaweah Project -   1,437 Cbr -  
30.95.302 Sutter Basin Feasibility Study 1,804 Sbr 1,280 Sbr -  
30.95.305 Rock Creek-Keefer Slough Feasibility Study 45 Sb 445 Sbr -  
30.95.306 West Stanislaus Feasibility Study 532 Sb 2,045 Sbr -  
30.95.310 Lower Cache Creek, Yolo County, Woodland Area Project 650 Sb 907 Sbr -  
30.95.311 Folsom Dam Modifications Project 17,191 Cbr 100,644 ACbr -  
30.95.314 Frazier Creek/Strathmore Creek Feasiblity Study 73 Sb 406 Sbr -  
30.95.315 White River/Deer Creek Feasiblity Study 69 Sb 425 Sbr -  
30.95.316 Merced County Streams Project Bear Creek Unit 36 Cbr 2,939 CSbr -  
30.95.320 Lower San Joaquin River Regional Project 1,696 Sb 2,280 Sbr -  
30.95.328 American River Watershed, Folsom Dam Raise Project 21 ACb 211 ACb -  
30.95.330 American River Watershed, Folsom Dam Raise Project, Bridge Element -   1,613 ACb -  
30.95.337 Butte Slough Outfall Gates Rehabilitation Project 10 CWb 15,095 CWb -  
30.95.340 Systemwide Levee Evaluations and Repairs 46,031 ACb 238,657 ACPSWb -  
30.95.341 State-Federal Flood Control Evaluations 297 Wb 11,859 Wb -  
30.95.342 Sutter Pumping Plants' Control System -423 ACb 3,686 ACb -  
30.95.343 Sutter Bypass East Water Control Structures 720 Cb 2,305 CWb -  
30.95.344 Knights Landing Outfall Gates Rehabilitation 948 ACb 9,103 ACb -  
30.95.345 Sacramento Yard-Soil and Groundwater Investigation and Remediation 132 CWb 4,566 CWb -  
  Totals, Major Projects $149,921   $849,110   $232,234  
Total Expenditures (All Projects) $149,921   $849,110   $232,234  

FUNDING Back to Top
Fund Code Fund Actual
2010-11*
Estimated
2011-12*
Proposed
2012-13*
0001 General Fund -$494 $1,066 $-
0506 Central Valley Water Project Construction Fund - 289,120 232,234
0995 Reimbursements 14,298 68,131 -
6008 State Capital Protection Subaccount - 1,490 -
6026 Bay-Delta Multipurpose Water Management Subaccount - 20,450 -
6031 Water Security, Clean Drinking Water, Coastal and Beach Protection Fund of 2002 - 10,000 -
6051 Safe Drinking Water, Water Quality and Supply, Flood Control, River and Coastal Protection Fund of 2006 719 2,749 -
6052 Disaster Preparedness and Flood Prevention Bond Fund of 2006 135,398 456,104 -
Total Expenditures (All Funds) $149,921 $849,110 $232,234

Refer to the
Infrastructure Detail of Appropriations and Adjustments (pdf * - 5K) document for additional information.