3860 Department of Water Resources
Infrastructure Overview

The Department of Water Resources has two major infrastructure programs: the State Water Project and the flood control system in the Central Valley. The State Water Project is a water storage and delivery system that consists of 28 dams and reservoirs, 22 pumping plants, 3 pumping-generating plants, 5 hydroelectric power plants, and more than 660 miles of canals and pipelines. The Project provides water to 23 million Californians and 755,000 acres of irrigated farmland. Existing flood control infrastructure in the Central Valley consists of 1,595 miles of levees, 348,000 acres of channels and floodways, nearly 800,000 linear feet of bank protection, and 55 various flood control structures. In general, these facilities provide more flood protection in urbanized areas and less in agricultural areas.


MAJOR PROJECT CHANGES Back to Top
  • The Budget provides $126.5 million Proposition 1E for Systemwide Levee Evaluations and Repairs to help ensure weak portions of levees in the Central Valley are identified and repaired.

  • The Budget provides $9.5 million Proposition 1E and $3.5 million in local reimbursements for the following five flood control projects in the Central Valley: (1) West Sacramento Project, (2) Mid-Valley Levee Reconstruction Project, (3) South Sacramento County Streams, (4) Merced County Streams Project, Bear Creek Unit, and (5) Sutter Bypass East Water Control Structures.


SUMMARY OF PROJECTS Back to Top
Provides expenditures for each major and minor capital project funded in this state agency's budget for the past, current, and budget years. The project phase and fund classification are also identified. The Standard Footnotes key can be accessed by clicking on any footnote link.


Code State Building Program Expenditures Actual
2006-07*
Estimated
2007-08*
Proposed
2008-09*
01 CAPITAL OUTLAY      
  Major Projects      
10.95 CONTINUING FORMULATION OF THE CALIFORNIA WATER PLAN $-   $56,600   $3,450  
10.95.015 South Delta Improvements Program -   56,600 Cb -  
10.95.180 Franks Tract Pilot Project -   -   3,450 AWb
20.20 IMPLEMENTATION OF THE STATE WATER RESOURCES DEVELOPMENT SYSTEM $548,468   $122,323   $122,323  
20.20.020 Design and Construction 548,468 Vn 122,323 Vn 122,323 Vn
30.95 PUBLIC SAFETY AND PREVENTION OF DAMAGE $216,273   $304,173   $140,449  
30.95.010 Sacramento River Bank Protection Project 2,609 ACg 2,595 ACg -  
30.95.030 Merced County Streams, Castle Dam Unit -   464 Cgr -  
30.95.085 Cache Creek Settling Basin Project -   8 ACg -  
30.95.105 Marysville/Yuba Levee Reconstruction -474 ACgr 479 Acg -  
30.95.111 1997 Flood Damage Repair Projects 53 ACg 487 ACgr -  
30.95.115 American River Flood Control Project Phase 1 - Common Elements 492 ACgr 2,047 ACgr -  
30.95.130 West Sacramento Project -   10,960 WCgbr 1,300 Wbr
30.95.155 Mid-Valley Levee Reconstruction Project -   2,453 Cgbr 2,782 ACbr
30.95.200 Magpie Creek Small Flood Control Project -   2,019 AWCb -  
30.95.211 1997 Flood Damage Repair Projects - San Joaquin Valley -   346 Ag -  
30.95.215 Lower Sacramento Area Levee Reconstruction Project -   28 Cg -  
30.95.220 Upper Sacramento Area Levee Restoration Project 142 Cgr 745 Cgr -  
30.95.245 American River Flood Control Project - Natomas Features 494 Cgr 3,742 Cgbr -  
30.95.250 Yuba River Basin Project 306 ACgr 1,834 ACgr -  
30.95.255 Eastside Bypass Levee Raising Project -   55 Ag -  
30.95.260 South Sacramento County Streams 271 Acgb 13,720 ACgbr 1,624 ACbr
30.95.280 Terminus Dam, Lake Kaweah Project -80 ACgr 1,651 ACgr -  
30.95.295 Tehama Section 205 Flood Control Project -   704 Cgr -  
30.95.297 Success Reservoir Enlargement Project -   203 Wgr -  
30.95.305 Rock Creek-Keefer Slough Feasibility Study -   815 Sbr 763 Sbr
30.95.306 West Stanislaus Feasibility Study -   755 Sbr -  
30.95.309 American River Long-Term Flood Protection Project 199 SWg -   -  
30.95.311 Folsom Dam Modifications Project 3,064 Cgr 11,957 Cgr -  
30.95.314 Frazier Creek/Strathmore Creek Feasiblity Study -   577 Sbr 590 Sbr
30.95.315 White River/Deer Creek Feasiblity Study -   577 Sbr 590 Sbr
30.95.316 Merced County Streams Project Bear Creek Unit -   -   2,300 Sbr
30.95.328 American River Watershed, Folsom Dam Raise Project -   29,309 ACbr -  
30.95.330 American River Watershed, Folsom Dam Raise Project, Bridge Element -   11,163 Cgbr -  
30.95.334 Emergency Repair of Critical Erosion 209,197 ACg 7,980 Sg -  
30.95.340 Systemwide Levee Evaluations and Repairs -   165,000 SWCb 126,500 SWCb
30.95.341 State-Federal Flood Control Evaluations -   20,000 Cb -  
30.95.342 Sutter Pumping Plants' Control System -   4,500 Cb -  
30.95.343 Sutter Bypass East Water Control Structures -   7,000 WCb 4,000 Cb
  Totals, Major Projects $764,741   $483,096   $266,222  
Total Expenditures (All Projects) $764,741   $483,096   $266,222  

FUNDING Back to Top
Fund Code Fund Actual
2006-07*
Estimated
2007-08*
Proposed
2008-09*
0001 General Fund $214,405 $24,911 $-
0506 Central Valley Water Project Construction Fund 548,468 122,323 122,323
0995 Reimbursements 1,868 35,779 3,287
6008 State Capital Protection Subaccount - 1,490 -
6026 Bay-Delta Multipurpose Water Management Subaccount - 41,600 3,450
6031 Water Security, Clean Drinking Water, Coastal and Beach Protection Fund of 2002 - 15,000 -
6051 Safe Drinking Water, Water Quality and Supply, Flood Control, River and Coastal Protection Fund of 2006 - 1,736 1,206
6052 Disaster Preparedness and Flood Prevention Bond Fund of 2006 - 240,257 135,956
Total Expenditures (All Funds) $764,741 $483,096 $266,222

Refer to the
Infrastructure Detail of Appropriations and Adjustments (pdf * - 5K) document for additional information.